Gas and steam turbine power station Bocholt / Lünen

close layer
  • Processing: 1999 - 2000
  • Client: STEAG

To get the permission to extend a power station, a preliminary ruling is needed (§9 Federal Immission Control Act). The working out of this extension included an environmental conversation elaboration.